Tuesday, January 24, 2012

Status fungsional di Bidang SJK Tahun 2012

Status fungsional di Bidang SJK per Januari 2012

Rakhmat : Struktural
Masluhin : Struktural
Dhanu : sudah diklat
Junaidi : BT
Eko : Struktural
Sulis : Struktural

Suratman : Sudah diklat
Ghofir : Prakom Pertama
Intan : Prakom Pertama
Rachman : Prakom Pelaksana
Kasih W : Struktural

Sulasno : Struktural
Rahadi : Prakom Muda
Roliana : Prakom Penyelia
Wen : Struktural

Monday, January 09, 2012

IP Address 2012

192.168.16.x
1 = NOC
2 = RB1100 PPIN, SJK, dll
3 = RB1100 Pusat-pusat
4 = RB1000 di SJK
5 = HP ProCurve 2510G-24 kawasan
6 = HP ProCurve 2510G-24 VLAN
7 = RB1000 di SJK
8 = HP All-In-One di SJK
9 = PTLR, Monitoring Lingkungan

Tuesday, January 03, 2012

Kegiatan 2012

2012-01-06 : Pasang switch HP ProCurve di SRP untuk gantikan swicth 16.x. Pasang Power Supply #3 ke Blade Enclosure c3000 di KPB. Pasang Blade #4 ke Blade Enclosure c3000 di KPB.
2012-01-05 : Tambah satu Mikrotik RB1100 di SRP. Pasang UPS APC SU3000 di KPB. Pasang PDU di KPB. Pasang UPS APC SU3000 di PSJ. Pasang HP ProCurve di PSJ. Optimasi switch PPIN (TU) ke sebuah AT-GS950-48 di SRP.
2012-01-04 : Pasang PDU SRP, optimasi switch PPIN (SI, DII, KOM) ke sebuah AT-GS950-48, konfigurasi VLAN di switch HP ProCurve di SRP
2012-01-03 : Melanjutkan instalasi UPS APC SU3000 dan Batt Pack di SRP.
2012-01-02 : Instalasi 1 unit UPS APC SU3000 beserta 1 unit Battery Pack di SRP.
2012-01-02 : Terminasi FO sebanyak 5 titik di IFI untuk memulihkan koneksi ke PTKMR.
2012-01-02 : Pengiriman 2 unit UPS APC SU3000RM dan 2 unit PC ke KPB dan PSJ
2012-01-02 : Pengalihan 6 pair koneksi FO dari Gd 31 ke Gd 71, yaitu Gd 10. 11, 20, 40, 42, dan 50.